Directions to Wbs Studio Musik (Bogor) with public transportation
The following transit lines have routes that pass near Wbs Studio Musik
Bus: 50, 59.
How to get to Wbs Studio Musik by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stop near Wbs Studio Musik in Bogor
- Jalan Raya Abdul Fatah 24, 11 min walk,
Bus lines to Wbs Studio Musik in Bogor
- 50, Laladon,
What are the closest stations to Wbs Studio Musik?
The closest stations to Wbs Studio Musik are:
- Jalan Raya Abdul Fatah 24 is 788 meters away, 11 min walk.
Which bus lines stop near Wbs Studio Musik?
These bus lines stop near Wbs Studio Musik: 50, 59.
What’s the nearest bus station to Wbs Studio Musik in Bogor?
The nearest bus station to Wbs Studio Musik in Bogor is Jalan Raya Abdul Fatah 24. It’s a 11 min walk away.
What time is the first bus to Wbs Studio Musik in Bogor?
The 50 is the first bus that goes to Wbs Studio Musik in Bogor. It stops nearby at 5:11 AM.
What time is the last bus to Wbs Studio Musik in Bogor?
The 50 is the last bus that goes to Wbs Studio Musik in Bogor. It stops nearby at 11:15 PM.
See Wbs Studio Musik, Bogor, on the map
Public Transit to Wbs Studio Musik in Bogor
Wondering how to get to Wbs Studio Musik in Bogor? Moovit helps you find the best way to get to Wbs Studio Musik with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Wbs Studio Musik in real time.
Looking for the nearest stop or station to Wbs Studio Musik? Check out this list of stops closest to your destination: Jalan Raya Abdul Fatah 24.
Bus: 50, 59.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Studio Musik easily from the Moovit App or Website.
We make riding to Wbs Studio Musik easy, which is why over 1.5 million users, including users in Bogor, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, costs and ride fares to Wbs Studio Musik, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Studio Musik Address: Bogor Kabupaten 16272 street in Bogor
- Masjid at-Taqwa Tapos Babakan,
- Kreasi Ika,
- Toko Arif Hodayatullah,
- Wisata Kolam Renang Lembah Kahuripan,
- MTS Swasta al Hikmah,
- Kuliner,
- Yuhaeni Msi,
- Pkbm al Bayan,
- Pkbm Nurul Ihsan,
- MI Swasta Manba Ussa Adah,
- Husin Nursery,
- Cafe0,
- Toko Beras Haji Oneng,
- Karsih,
- Galeri Umkm Tenjolaya,
- Nindi,
- Al Motor,
- Sinar Pajar,
- Depot Air Minum Isi Ulang Asyafa,
- Tapos Dua - 2
Places Near Wbs Studio Musik (Bogor)
- RS Persahabatan Rawamangun Jakarta Timur, Jakarta Timur,
- Bus Patas AC 132 (Bekasi - Lebak Bulus) via Tol Bekasi Timur, Jakarta Selatan,
- Condet, Jakarta Timur,
- Halte Transjakarta Mayestik, Jakarta Selatan,
- RS Harapan Kita (Halte TransJakarta RS Harapan Kita), Jakarta Barat,
- Halte TransJakarta Sarinah, Jakarta Pusat,
- Bus Agra Mas BT (Bekasi Timur - Jati Asih - Tanjung Barat - Veteran - BSD), Kota Bekasi,
- Baywalk Mall Pluit, Jakarta Utara,
- RS Pusat Otak Nasional (RS PON), Jakarta Timur,
- PIM 1,2 ( Pondok Indah Mall ),Jakarta Selatan, Jakarta Selatan,
- Markas Besar Polisi Republik Indonesia (MABES POLRI), Jakarta Selatan,
- Jagakarsa, Jakarta Selatan,
- Mall Kokas, Jakarta Selatan,
- Jl. RS Fatmawati, Jakarta Selatan,
- Halte TransJakarta UNJ, Jakarta Timur,
- Central Park, Jakarta Selatan,
- Hollywood XXI, Jakarta Selatan,
- Car Free Day (CFD), Jakarta Pusat,
- Halte TransJakarta Slipi Petamburan, Jakarta Pusat,
- Halte TransJakarta RS Tarakan, Jakarta Pusat
How to get to popular places in Jakarta with public transit
Get around Bogor by public transit!
Traveling around Bogor has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Bogor.
When traveling to any destination around Bogor use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Bogor or how to pay for public transit in Bogor? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Bogor public transit lines? Moovit public transit app shows all public transit maps in Bogor with all Bus, Train, Metro and LRT routes and stops on an interactive map.
Jakarta has 4 transit type(s), including: Bus, Train, Metro and LRT, operated by several transit agencies, including MRT Jakarta, LRT Jakarta, LRT Jabodebek, PT. Kereta Commuter Indonesia, Transjakarta BRT, Transjakarta, Transjakarta Microbus, RoyalTrans, TransJabodetabek, KWK (Koperasi Wahana Kalpika), PPD (Pengangkutan Penumpang Djakarta), Mayasari Bakti, Angkutan Tangerang, KOASI (Koperasi Angkutan Bekasi) and Angkutan Kota Depok