Directions to Wbs Training (Bavaria) with public transportation
The following transit lines have routes that pass near Wbs Training
Train: RB45, RE3, RB44, RB44, RB44.
Bus: 603, E14, E15, RB3, 301.
How to get to Wbs Training by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Wbs Training by train?
Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.
Bus stops near Wbs Training in Bavaria
- Landshut, Altstadt, 1 min walk,
- Landshut, Postplatz, 2 min walk,
- Landshut, Isargestade, 3 min walk,
- Landshut, Neustadt, 4 min walk,
- Landshut, Regierungsplatz, 5 min walk,
Train stations near Wbs Training in Bavaria
- Landshut (Bay) Süd, 21 min walk,
- Landshut (Bay) Hauptbahnhof, 49 min walk,
Bus lines to Wbs Training in Bavaria
- 301, Landshut, Maximilianstraße,
- 309, Niederaichbach, Kirche,
- 318, Bruckberg, Rathaus,
- E30, Landshut, Kupfereck - Landshut, Am Lurzenhof,
- E32, Landshut, Tannenburganger - Landshut, Bismarckplatz,
- E54, Landshut, Schulstraße - Landshut, Altstadt,
- 539, Landshut, Altstadt - Mengkofen, Am Schwebach,
- 603, Landshut, Tulpenstraße - Landshut, Auloh Kanalstraße,
- 605, Landshut (Bay) Hauptbahnhof - Landshut, Hirschstetterweg,
- 606, Altdorf, Eugenbach - Landshut, Max-v.Oppenheim-Weg,
- 609, Tondorf, Kirche - Landshut, Altstadt,
- 623, Landshut, Eichenstraße - Frauenberg (Landshut),
- 625, Landshut (Bay) Hauptbahnhof - Landshut, Hirschstetterweg,
- 626, Landshut, Altstadt - Landshut, Schweinbach,
- 627, Landshut, Altstadt - Landshut, Altstadt,
- 678, Landshut, Maximilianstraße - Bruckberg, Rathaus,
- E03, Landshut (Bay) Hauptbahnhof - Landshut, Am Lurzenhof,
- E21, Landshut, Ländtorplatz - Landshut, Schulstraße,
- E22, Altdorf, Bernsteinstraße - Landshut, Schulstraße,
- 611, Landshut, Holzfeilerweg - Landshut, Stephan-Rottaler-Str.,
What are the closest stations to Wbs Training?
The closest stations to Wbs Training are:
- Landshut, Altstadt stop is 56 meters away, 1 min walk.
- Landshut, Postplatz stop is 140 meters away, 2 min walk.
- Landshut, Isargestade stop is 220 meters away, 3 min walk.
- Landshut, Neustadt stop is 289 meters away, 4 min walk.
- Landshut, Regierungsplatz stop is 348 meters away, 5 min walk.
- Landshut (Bay) Süd station is 1603 meters away, 21 min walk.
- Landshut (Bay) Hauptbahnhof station is 3879 meters away, 49 min walk.
Which train lines stop near Wbs Training?
These train lines stop near Wbs Training: RB45, RE3.
Which bus lines stop near Wbs Training?
These bus lines stop near Wbs Training: 603, E14, E15, RB3.
What’s the nearest train station to Wbs Training in Bavaria?
The nearest train station to Wbs Training in Bavaria is Landshut (Bay) Süd. It’s a 21 min walk away.
What’s the nearest bus station to Wbs Training in Bavaria?
The nearest bus station to Wbs Training in Bavaria is Landshut, Altstadt. It’s a 1 min walk away.
What time is the first train to Wbs Training in Bavaria?
The RE22 is the first train that goes to Wbs Training in Bavaria. It stops nearby at 3:19 AM.
What time is the last train to Wbs Training in Bavaria?
The RB33 is the last train that goes to Wbs Training in Bavaria. It stops nearby at 1:53 AM.
What time is the first bus to Wbs Training in Bavaria?
The 623 is the first bus that goes to Wbs Training in Bavaria. It stops nearby at 3:05 AM.
What time is the last bus to Wbs Training in Bavaria?
The 623 is the last bus that goes to Wbs Training in Bavaria. It stops nearby at 12:06 AM.
See Wbs Training, Bavaria, on the map
Public Transit to Wbs Training in Bavaria
Wondering how to get to Wbs Training in Bavaria? Moovit helps you find the best way to get to Wbs Training with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Wbs Training in real time.
Looking for the nearest stop or station to Wbs Training? Check out this list of stops closest to your destination: Landshut; Landshut; Landshut; Landshut; Landshut; Landshut (Bay) Süd; Landshut (Bay) Hauptbahnhof.
Train: RB45, RE3, RB44, RB44, RB44, RE2, RE22, RE22, RE23.Bus: 603, E14, E15, RB3, 301, 309, 318, E30, E32, E54, 539, E03, E21, E22, 611, 614.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Training easily from the Moovit App or Website.
We make riding to Wbs Training easy, which is why over 1.7 billion users, including users in Bavaria, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus and train, costs and ride fares to Wbs Training, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Training Address: Altstadt 362 in Bavaria
- Bouncin Balls Gmbh,
- Tchibo Filiale,
- Ra-Fa Proksch I Geiselbrecht Rechts- Und Fachanwälte,
- Stark- Ivanov & Bach Gbr,
- Heilpraktiker Für Psychotherapie Martin Vogelsang,
- Sprachschule Creative Landshut,
- Schuhe by Sutor Landshut,
- More & More,
- H&H Nagelstudio,
- Sanflow Yoga Landshut,
- Brax Store Landshut,
- Silke Pech - Mentorin Für Angehörige Von Depressionskranken,
- Ac Landshut Devils - Offizielle Seite,
- Kroatische Feinkost Zeljko,
- Hamoudi Pharmacy ‖ صيدلية رفيق حمودي,
- Literaturzauber.Com,
- Pomodoro E Mozzarella Restaurant,
- Dampfextra,
- Probonio Gmbh,
- Stiftsbasilika St. Martin
Places Near Wbs Training (Bavaria)
- Utopia, Schwabing West,
- Schön Klinik München Harlaching, Giesing,
- München Tollwood Festival, München - Innenstadt,
- IKEA, Ottobrunn,
- Prinzregententheater, Bogenhausen,
- Gartencenter Seebauer, Ramersdorf,
- Hafen Passau-Racklau,
- Flaucher, Giesing,
- Riem Arcaden, Messestadt Riem,
- Zenith - Die Kulturhalle, Freimann,
- BMW AG Werk 01.50, Am Hart,
- Schloss Kaltenberg,
- Eisbach Welle, München - Innenstadt,
- GOP Varieté-Theater, München - Innenstadt,
- Garmischer Straße 19-21, Schwanthalerhöhe,
- Bahnwärter Thiel, München - Innenstadt,
- Backstage (Backstage München), Neuhausen,
- Circus Krone, Marsfeld,
- IKEA,
- Heßstraße, Maxvorstadt