Directions to Wbs Training (Bavaria) with public transportation
The following transit lines have routes that pass near Wbs Training
Train: RE14, S1, S3.
Subway: U1, U2, U3.
Bus: 30, 36, 37, 44, RE22.
How to get to Wbs Training by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Wbs Training by train?
Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Wbs Training by subway?
Click on the subway route to see step-by-step directions with maps, line arrival times and updated time schedules.
Subway stations near Wbs Training in Bavaria
- Nürnberg Weißer Turm, 3 min walk,
- Nürnberg Opernhaus, 6 min walk,
Bus stops near Wbs Training in Bavaria
- Nürnberg Plärrer Ost, 5 min walk,
- Nürnberg Obere Turnstr., 7 min walk,
- Nürnberg Hbf, 7 min walk,
- Nürnberg Hauptmarkt, 10 min walk,
Light Rail stations near Wbs Training in Bavaria
- Nürnberg Obere Turnstr., 6 min walk,
Bus lines to Wbs Training in Bavaria
- N6, Nürnberg Hbf,
- N7, Großhabersdorf,
- N10, Erlangen, Hugenottenpl.,
- 36, Nürnberg Doku-Zentrum,
- N8, Bronnamberg,
- N2, Hersbruck (l Pegnitz) - Nürnberg Hbf,
- N3, Nürnberg Hbf - Nürnberg Heinemannbrücke,
- N4, Nürnberg Hbf - Nürnberg Brunn Schleife,
- N13, Nürnberg Hbf - Simmelsdorf-Hüttenbach,
- N15, Nürnberg Hbf - Ezelsdorf Hauptstr.,
- 43, Nürnberg Heinemannbrücke - Nürnberg Hbf,
- N5, Nürnberg Worzeld. Feuerwehrh.,
- N9, Nürnberg Hbf - Burgfarrnbach Külsheimstr.,
- N14, Nürnberg Hbf - Fürth Stadtgrenze,
- 44, Nürnb. Langwasser Mitte - Nürnberg Hbf,
- N11, Nürnberg Hbf,
What are the closest stations to Wbs Training?
The closest stations to Wbs Training are:
- Nürnberg Weißer Turm station is 215 meters away, 3 min walk.
- Nürnberg Plärrer Ost stop is 338 meters away, 5 min walk.
- Nürnberg Opernhaus station is 413 meters away, 6 min walk.
- Nürnberg Obere Turnstr. station is 463 meters away, 6 min walk.
- Nürnberg Hbf stop is 485 meters away, 7 min walk.
- Nürnberg Hauptmarkt stop is 701 meters away, 10 min walk.
Which train lines stop near Wbs Training?
These train lines stop near Wbs Training: RE14, S1, S3.
Which subway lines stop near Wbs Training?
These subway lines stop near Wbs Training: U1, U2.
Which bus lines stop near Wbs Training?
These bus lines stop near Wbs Training: 30, 36, 37, 44, RE22.
What’s the nearest light rail station to Wbs Training in Bavaria?
The nearest light rail station to Wbs Training in Bavaria is Nürnberg Obere Turnstr.. It’s a 6 min walk away.
What’s the nearest subway station to Wbs Training in Bavaria?
The nearest subway station to Wbs Training in Bavaria is Nürnberg Weißer Turm. It’s a 3 min walk away.
What’s the nearest bus station to Wbs Training in Bavaria?
The nearest bus station to Wbs Training in Bavaria is Nürnberg Plärrer Ost. It’s a 5 min walk away.
What time is the first light rail to Wbs Training in Bavaria?
The 4 is the first light rail that goes to Wbs Training in Bavaria. It stops nearby at 4:34 AM.
What time is the last light rail to Wbs Training in Bavaria?
The 4 is the last light rail that goes to Wbs Training in Bavaria. It stops nearby at 1:12 AM.
What time is the first subway to Wbs Training in Bavaria?
The N7 is the first subway that goes to Wbs Training in Bavaria. It stops nearby at 3:00 AM.
What time is the last subway to Wbs Training in Bavaria?
The U2 is the last subway that goes to Wbs Training in Bavaria. It stops nearby at 12:59 AM.
What time is the first bus to Wbs Training in Bavaria?
The N8 is the first bus that goes to Wbs Training in Bavaria. It stops nearby at 3:00 AM.
What time is the last bus to Wbs Training in Bavaria?
The 43 is the last bus that goes to Wbs Training in Bavaria. It stops nearby at 12:54 AM.
See Wbs Training, Bavaria, on the map
Public Transit to Wbs Training in Bavaria
Wondering how to get to Wbs Training in Bavaria? Moovit helps you find the best way to get to Wbs Training with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Wbs Training in real time.
Looking for the nearest stop or station to Wbs Training? Check out this list of stops closest to your destination: Nürnberg Weißer Turm; Nürnberg Plärrer Ost; Nürnberg Opernhaus; Nürnberg Obere Turnstr.; Nürnberg Hbf; Nürnberg Hauptmarkt.
Train: RE14, S1, S3.Subway: U1, U2, U3.Bus: 30, 36, 37, 44, RE22, N6, N7, N10, N8, N2, N3, N4, N13, N15.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Training easily from the Moovit App or Website.
We make riding to Wbs Training easy, which is why over 1.7 billion users, including users in Bavaria, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, subway and train, costs and ride fares to Wbs Training, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Training Address: Kornmarkt 8 in Bavaria
- Pho,
- Ristorante La Fiamma,
- Streetdance Academy Nürnberg,
- Förderverein Neugierig E.V.,
- Dance Maxx Gmbh,
- Schilder-Klug,
- Dr. Tom Schloss,
- Dr. Jürgen Wollner,
- Beautydent Fichtner Dentallabor,
- Dju Nürnberg,
- Success Im Dance Maxx,
- Mobile Exclusive,
- Dgb Rechtsschutz Gmbh,
- The North Face Store,
- Psychotherapie Molina,
- Jz,
- British Empire Handel Gmbh & Co. Kg,
- Sawasdee,
- American Store & British Empire,
- Deutscher Alpenverein-Sektion Nürnberg E.V.
Places Near Wbs Training (Bavaria)
- IKEA, Eching,
- BMW AG Werk 01.50, Am Hart,
- Klinikum Bogenhausen, Bogenhausen,
- Gartencenter Seebauer, Ramersdorf,
- Olympiahalle (Olympiahalle München), Am Riesenfeld,
- Paulaner am Nockherberg, Haidhausen,
- Mathäser Filmpalast, München - Innenstadt,
- Eisbach Welle, München - Innenstadt,
- Therme Erding, Erding,
- Flaucher, Giesing,
- Garmischer Straße 19-21, Schwanthalerhöhe,
- München Tollwood Festival, München - Innenstadt,
- IKEA München-Brunnthal, Ottobrunn,
- Wildpark Poing, Poing,
- Schön Klinik München Harlaching, Giesing,
- Prinzregententheater, Bogenhausen,
- Primark München, Neuperlach,
- GOP Varieté-Theater, München - Innenstadt,
- Allianz Arena, Munchen, München - Innenstadt,
- Alte Pinakothek, Maxvorstadt