How to Get to Zapfsaule Raci in Geneve by Train or Bus?

Directions to Zapfsaule Raci (Geneve) with public transportation

The following transit lines have routes that pass near Zapfsaule Raci

  • BusBus: 159N50N50.
  • TrainTrain: IC1S5EXTICIR13.

How to get to Zapfsaule Raci by train?

Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.

Bus stops near Zapfsaule Raci in Geneve

  • Andwil Sg, Linden, 3 min walk,
  • Andwil Sg, Post, 6 min walk,

Train station near Zapfsaule Raci in Geneve

  • Gossau Sg, 27 min walk,

Bus lines to Zapfsaule Raci in Geneve

  • 159, Gossau Sg, Bahnhof,
  • N50, Gossau Sg, Bahnhof,
  • N50, Zihlschlacht, Mitteldorf,
Questions & Answers
  • What are the closest stations to Zapfsaule Raci?

    The closest stations to Zapfsaule Raci are:

    • Andwil Sg, Linden is 223 meters away, 3 min walk.
    • Andwil Sg, Post is 402 meters away, 6 min walk.
    • Gossau Sg is 2090 meters away, 27 min walk.
  • Which bus line stops near Zapfsaule Raci?

    159 (Gossau Sg, Bahnhof‎→Gossau Sg, Mettendorf)

  • Which train lines stop near Zapfsaule Raci?

    These train lines stop near Zapfsaule Raci: IC1, S5.

  • What’s the nearest train station to Zapfsaule Raci in Geneve?

    The nearest train station to Zapfsaule Raci in Geneve is Gossau Sg. It’s a 27 min walk away.

  • What’s the nearest bus station to Zapfsaule Raci in Geneve?

    The nearest bus station to Zapfsaule Raci in Geneve is Andwil Sg, Linden. It’s a 3 min walk away.

  • What time is the first train to Zapfsaule Raci in Geneve?

    The IR13 is the first train that goes to Zapfsaule Raci in Geneve. It stops nearby at 4:44 AM.

  • What time is the last train to Zapfsaule Raci in Geneve?

    The IR13 is the last train that goes to Zapfsaule Raci in Geneve. It stops nearby at 1:21 AM.

  • What time is the first bus to Zapfsaule Raci in Geneve?

    The 159 is the first bus that goes to Zapfsaule Raci in Geneve. It stops nearby at 5:46 AM.

  • What time is the last bus to Zapfsaule Raci in Geneve?

    The 159 is the last bus that goes to Zapfsaule Raci in Geneve. It stops nearby at 11:56 PM.

See Zapfsaule Raci, Geneve, on the map

Public Transit to Zapfsaule Raci in Geneve

Wondering how to get to Zapfsaule Raci in Geneve? Moovit helps you find the best way to get to Zapfsaule Raci with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Zapfsaule Raci in real time.

Looking for the nearest stop or station to Zapfsaule Raci? Check out this list of stops closest to your destination: Andwil Sg; Andwil Sg; Gossau Sg.

Bus: 159N50N50.Train: IC1S5EXTICIR13RE13.

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Zapfsaule Raci easily from the Moovit App or Website.

We make riding to Zapfsaule Raci easy, which is why over 1.5 million users, including users in Geneve, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of train and bus, costs and ride fares to Zapfsaule Raci, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Zapfsaule Raci Address: Zapfsaule Raci, Sonnenbüelstrasse 13, 9204 Andwil Sankt Gallen street in Geneve

Zapfsaule Raci

Get around Geneve by public transit!

Traveling around Geneve has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Geneve.

When traveling to any destination around Geneve use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

Wondering how to use public transit in Geneve or how to pay for public transit in Geneve? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Geneve public transit lines? Moovit public transit app shows all public transit maps in Geneve with all Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular routes and stops on an interactive map.

Geneve has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular, operated by several transit agencies, including Schweizerische Bundesbahnen SBB, Nyon-St-Cergue-Morez, Société Nationale des Chemins de fer Français, TPG, Interimsfahrplan / Horaire interimaire / Orario ad interim, SBB Infrastruktur AG Bahnersatz, Transports Publics de l'agglomération d'Annemasse, Bus Nyon-Prangins, Alpbus Fournier, CGN SA, Transports Publics Neuchâtelois SA (tc), But, PostAuto AG, Transports Publics de la Région Nyonnaise and SMGN

Public transit lines with stations closest to Zapfsaule Raci in Geneve

Train lines with stations closest to Zapfsaule Raci in Geneve

Bus lines with stations closest to Zapfsaule Raci in Geneve