Metro do Porto (Subway) E Metro Line Map - Trindade
Metro do Porto (Subway) E Metro Route Schedule and Stops (Updated)
The E metro (Trindade) has 16 stations departing from Aeroporto and ending at Trindade.
Choose any of the E metro stations below to find updated real-time schedules and to see their route map.
Direction: Trindade (16 stops)
Aeroporto
Botica
Verdes
Crestins
Esposade
Custóias
Fonte do Cuco
Senhora da Hora
NorteShopping I Sete Bicas
Viso
Ramalde
Francos
Casa da Música
Carolina Michaelis
Lapa
Trindade
E FAQ
What time does the E metro start operating?
Services on the E metro start at 05:57 on Sunday.
What time does the E metro stop working?
Services on the E metro stop at 19:03 on Saturday, Sunday.
What time does the E metro arrive?
When does the Linha Violeta metro line come? for live arrival times and to see the full schedule for the Linha Violeta metro line that is closest to your location.
Does the Metro do Porto (Subway) E metro line run on Restoration of Independence?
The E metro's operating hours on Restoration of Independence may change. Check the Moovit app for the latest changes and live updates.
Is there a E metro station near me?
to view the nearest E metro station.
Metro do Porto (Subway) E Metro Line Map - Trindade
Metro do Porto (Subway) Service Alerts
See all updates on E (from Aeroporto), including real-time status info, metro delays, changes of routes, changes of stop locations, and any other service changes. Get a real-time map view of E (Trindade) and track the metro as it moves on the map. Download the app for all Metro do Porto (Subway) info now.
Ride & Pay with Moovit in Porto, Braga and Vila Real
No cash, no credit cards, no prepaid physical cards - just pay with the Moovit app. Moovit Pay is the smartest, safest, and most affordable way to buy transit tickets in Porto, Braga and Vila Real.
E line metro fare
Metro do Porto (Subway) E (Trindade) prices may change based on several factors. For more information about Metro do Porto (Subway) ticket costs please check the Moovit app or Metro do Porto (Subway)’s official website.
E (Metro do Porto (Subway))
The first stop of the E metro route is Aeroporto and the last stop is Trindade. E (Trindade) is operational during every day.
Additional information: E has 16 stations and the total trip duration for this route is approximately 27 minutes.
On the go? See why over 1.7 billion users trust Moovit as the best public transit app. Moovit gives you Metro do Porto (Subway) suggested routes, a real-time metro tracker, live directions, line route maps in Porto, Braga and Vila Real, and helps to find the closest E metro stations near you. No internet available? Download an offline PDF map and metro schedule for the E metro to take on your trip.
Line E Real-Time metro Tracker
Track line E (Trindade) on a live map in real time and follow its location as it moves between stations. Use Moovit as a line E metro tracker or a live Metro do Porto (Subway) metro tracker app and never miss your metro.
Use the app as a trip planner for Metro do Porto (Subway) or a trip planner for metro, bus, train, gondola, ferry or funicular to plan your route around Porto, Braga and Vila Real. The trip planner shows updated data for Metro do Porto (Subway) and any metro, including line E, in Porto, Braga and Vila Real.