Skip to main content
Train - RB54

RB54 Line

Pfullendorf - Aulendorf

DB Regio AG Baden-Württemberg

DB Regio AG Baden-Württemberg RB54 train Route Schedule and Stops (Updated)

The RB54 train (Aulendorf) has 6 stations departing from Pfullendorf Bf./Stadtgarten and ending at Aulendorf Bahnhof.

Choose any of the RB54 train stations below to find updated real-time schedules and to see their route map.

Direction: Aulendorf (6 stops)

  • Pfullendorf Bf./Stadtgarten

  • Burgweiler Bahnhof

  • Ostrach Bahnhof

  • Bahnhof Hoßkirch-Königsegg

  • Altshausen Bahnhof

  • Aulendorf Bahnhof

RB54 FAQ

  • What time does the RB54 train start operating?

    Services on the RB54 train start at 10:18 on Sunday, Monday.

  • What time does the RB54 train stop working?

    Services on the RB54 train stop at 18:18 on Sunday, Monday.

  • What time does the RB54 train arrive?

    When does the Pfullendorf - Aulendorf Train line come? Check Live Arrival Times for live arrival times and to see the full schedule for the Pfullendorf - Aulendorf Train line that is closest to your location.

  • Does the DB Regio AG Baden-Württemberg RB54 train line run on Whit Monday?

    The RB54 train's operating hours on Whit Monday may change. Check the Moovit app for latest changes and live updates.

  • Is there a RB54 train station near me?

    Click here to view the nearest RB54 train station.

DB Regio AG Baden-Württemberg RB54 train Line Map - Aulendorf

RB54 train Line Map

RB54 train Schedule

RB54 train line operates on weekends. Regular schedule hours: 10:18 - 18:18

DayOperating HoursFrequency (min)
Sun10:18 - 18:18240
Mon10:18 - 18:18240
TueNot OperationalNot Operational
WedNot OperationalNot Operational
ThuNot OperationalNot Operational
FriNot OperationalNot Operational
SatNot OperationalNot Operational

DB Regio AG Baden-Württemberg train Service Alerts

See all updates on RB54 (from Pfullendorf Bf./Stadtgarten), including real-time status info, train delays, changes of routes, changes of stops locations, and any other service changes. Get a real-time map view of RB54 (Aulendorf) and track the train as it moves on the map. Download the app for all DB Regio AG Baden-Württemberg info now.

RB54 line train fare

DB Regio AG Baden-Württemberg RB54 (Aulendorf) prices may change based on several factors. For more information about DB Regio AG Baden-Württemberg tickets costs please check the Moovit app or DB Regio AG Baden-Württemberg’s official website.

The Most Popular Urban Mobility App in Stuttgart.
All local mobility options in one app

RB54 (DB Regio AG Baden-Württemberg)

The first stop of the RB54 train route is Pfullendorf Bf./Stadtgarten and the last stop is Aulendorf Bahnhof. RB54 (Aulendorf) is operational during Sunday, Monday.

Additional information: RB54 has 6 stations and the total trip duration for this route is approximately 63 minutes.

On the go? See why over 1.5 million users trust Moovit as the best public transit app. Moovit gives you DB Regio AG Baden-Württemberg suggested routes, real-time train tracker, live directions, line route maps in Stuttgart, and helps to find the closest RB54 train stations near you. No internet available? Download an offline PDF map and train schedule for the RB54 train to take on your trip.

Line RB54 Real Time Train Tracker

Track line RB54 (Aulendorf) on a live map in real time and follow its location as it moves between stations. Use Moovit as a line RB54 train tracker or a live DB Regio AG Baden-Württemberg train tracker app and never miss your train.

Use the app as a trip planner for DB Regio AG Baden-Württemberg or a trip planner for Subway, Bus, Funicular, Train, S-Bahn, Light Rail or Ferry to plan your route around Stuttgart. The trip planner shows updated data for DB Regio AG Baden-Württemberg and any train, including line RB54, in Stuttgart

RB54 - Alternative Directions

Follow the LIVE location of line
000000RB54