Skip to main content

Tram

Schedules, Routes and Stops

Tram

Tram is a public transportation provider in Rhein-Main Gebiet which operates Light Rail lines.

The Tram has 23 Light Rail lines in Rhein-Main Gebiet with 2308 Light Rail stations.

Their Light Rail lines cover an area from the North (Marburg-Biedenkopf) with a stop at Biedenkopf-Weifenbach to the South (Odenwaldkreis) with a stop at Erbach (Odw.) Post.Their most western stop is Rüdesheim (Rhein) Kirchstraße (Rheingau-Taunus-Kreis) and the most eastern stop is Fulda Bahnhof (Fulda).

Do you work for Tram?

Partner with us!

All Tram lines in Rhein-Main Gebiet

To see updated Light Rail times, schedules and stations please click on a line below

Tram coverage area map

The Most Popular Urban Mobility App in Rhein-Main Gebiet.
All local mobility options in one app
Get it on Google Play Download on the App Store

Tram Updates

For Tram service alerts, please check the Moovit website for real-time info on light rail status, light rail delays, changes of light rail routes, changes of stations and any service changes.

Tram

Tram is a public transportation provider in Rhein-Main Gebiet which operates Light Rail lines.

The Tram has 23 Light Rail lines in Rhein-Main Gebiet with 2308 Light Rail stations.

Their Light Rail lines cover an area from the North (Marburg-Biedenkopf) with a stop at Biedenkopf-Weifenbach to the South (Odenwaldkreis) with a stop at Erbach (Odw.) Post.Their most western stop is Rüdesheim (Rhein) Kirchstraße (Rheingau-Taunus-Kreis) and the most eastern stop is Fulda Bahnhof (Fulda).

Facts about Tram

The Tram has Light Rail lines operating across Rhein-Main Gebiet including: Wiesbaden, Frankfurt Am Main, Marburg-Biedenkopf, Main-Taunus-Kreis, Darmstadt, Darmstadt-Dieburg, Wetteraukreis, Hochtaunuskreis, Mainz, Main-Kinzig-Kreis.

The longest line from the Tram is: 8. This Light Rail line starts from Frankfurt (Main) Hauptbahnhof (Frankfurt Am Main) and ends at Fulda Bahnhof (Fulda). It covers over 92 km and has 3 stops.

The shortest line is: 2. This Light Rail line begins from Darmstadt Berliner Allee (Darmstadt) and finishes at Darmstadt Rhein-/Neckarstraße (Darmstadt). It runs through 1 km with 2 stops.

Do you work for Tram?

Partner with us!

Tram schedule

Looking for a specific Tram Light Rail schedule? All Tram lines and schedules in Rhein-Main Gebiet can be found in the Moovit App. Moovit gives you directions for Tram routes and provides helpful step-by-step navigation.

Real-Time Arrivals, Schedules, Maps & More