Skip to main content
Metro - 7

El Rosario - Barranca del Muerto Line

STC (Metro CDMX)

STC (Metro CDMX) 7 metro Route Schedule and Stops (Updated)

The 7 metro (Dirección Barranca del Muerto) has 14 stations departing from El Rosario and ending at Barranca del Muerto.

Choose any of the 7 metro stations below to find updated real-time schedules and to see their route map.

Direction: Dirección Barranca del Muerto (14 stops)

  • El Rosario

  • Aquiles Serdán

  • Camarones

  • Refinería

  • Tacuba

  • San Joaquín

  • Polanco

  • Auditorio

  • Constituyentes

  • Tacubaya

  • San Pedro de los Pinos

  • San Antonio

  • Mixcoac

  • Barranca del Muerto

7 FAQ

  • What time does the 7 metro start operating?

    Services on the 7 metro start at 00:00 on Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, Saturday.

  • What time does the 7 metro stop working?

    Services on the 7 metro stop at 23:56 on Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, Saturday.

  • What time does the 7 metro arrive?

    When does the El Rosario - Barranca del Muerto Metro line come? Check Live Arrival Times for live arrival times and to see the full schedule for the El Rosario - Barranca del Muerto Metro line that is closest to your location.

  • How much is the 7 (Dirección Barranca del Muerto) metro fare?

    The El Rosario - Barranca del Muerto (Dirección Barranca del Muerto) metro fare is about $5.00.

  • Does the STC (Metro CDMX) 7 metro line run on Labor Day / May Day?

    The 7 metro's operating hours on Labor Day / May Day may change. Check the Moovit app for latest changes and live updates.

  • Is there a 7 metro station near me?

    Click here to view the nearest 7 metro station.

STC (Metro CDMX) 7 metro Line Map - Dirección Barranca del Muerto

7 metro Line Map

7 metro Schedule

7 metro line operates everyday. Regular schedule hours: 00:00 - 23:56

DayOperating HoursFrequency (min)
Sun00:00 - 23:564
Mon00:00 - 23:564
Tue00:00 - 23:564
Wed00:00 - 23:564
Thu00:00 - 23:564
Fri00:00 - 23:564
Sat00:00 - 23:564

STC (Metro CDMX) Service Alerts

See all updates on 7 (from El Rosario), including real-time status info, metro delays, changes of routes, changes of stops locations, and any other service changes. Get a real-time map view of 7 (Dirección Barranca del Muerto) and track the metro as it moves on the map. Download the app for all STC (Metro CDMX) info now.

7 line metro fare

STC (Metro CDMX) 7 (Dirección Barranca del Muerto) ride fare is about $5.00. Prices may change based on several factors. For more information about STC (Metro CDMX)’s ticket costs, please check the Moovit app or STC (Metro CDMX)’s official website.

The Most Popular Urban Mobility App in Ciudad de Mexico.
All local mobility options in one app

7 (STC (Metro CDMX))

The first stop of the 7 metro route is El Rosario and the last stop is Barranca del Muerto. 7 (Dirección Barranca del Muerto) is operational during everyday.

Additional information: 7 has 14 stations and the total trip duration for this route is approximately 42 minutes.

On the go? See why over 1.5 million users trust Moovit as the best public transit app. Moovit gives you STC (Metro CDMX) suggested routes, real-time metro tracker, live directions, line route maps in Ciudad de Mexico, and helps to find the closest 7 metro stations near you. No internet available? Download an offline PDF map and metro schedule for the 7 metro to take on your trip.

Line 7 Real Time Metro Tracker

Track line 7 (Dirección Barranca del Muerto) on a live map in real time and follow its location as it moves between stations. Use Moovit as a line 7 metro tracker or a live STC (Metro CDMX) metro tracker app and never miss your metro.

Use the app as a trip planner for STC (Metro CDMX) or a trip planner for Metro, Bus, Train or Gondola to plan your route around Ciudad de Mexico. The trip planner shows updated data for STC (Metro CDMX) and any metro, including line 7, in Ciudad de Mexico

7 - Alternative Directions

Follow the LIVE location of line 7
e87722