Skip to main content

How to get to Mount Bold in Mylor by Bus?

See Mount Bold, Mylor, on the map

Directions to Mount Bold (Mylor) with public transport

The following transport lines have routes that pass near Mount Bold

  • BusBus:737
Questions & Answers
  • Which Bus lines stop near Mount Bold?

    These Bus lines stop near Mount Bold: 737

See Mount Bold, Mylor, on the map

The Most Popular Urban Mobility App in Mylor.
All local mobility options in one app

Public Transit to Mount Bold in Mylor

Wondering how to get to Mount Bold in Mylor, Australia? Moovit helps you find the best way to get to Mount Bold with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Mount Bold in real time.

Bus:737

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Mount Bold easily from the Moovit App or Website.

We make riding to Mount Bold easy, which is why over 1.5 million users, including users in Mylor, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of Bus, costs and ride fares to Mount Bold, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Location: Mylor, Adelaide

Mount Bold, Mylor
Mount Bold, MylorMount Bold Reservoir is the largest reservoir in South Australia with a maximum capacity of over forty-six thousand megalitres. Costing A$1.1 million, the reservoir took six years to construct on the Onkaparinga River system between 1932 and 1938. The reservoir does not connect directly to the main reticulation system; rather, to maintain levels at Clarendon Weir, water is released only as required. Much of the water from Mount Bold will eventually end up at Happy Valley Reservoir and used to supply parts of the Mount Lofty Ranges and also Adelaide. A major renovation was completed in 1964 when the level of the dam was raised 6.4 metres to increase the reservoir's capacity by approximately 17,000 megalitres. Although originally supplying its own electricity through a small hydro-electricity plant, this was discontinued in 1961. However, Mount Bold is now considered a possible site for a future commercial mini-hydro generator. In early June 2007, the South Australian Government began a scoping study into expanding the reservoir's capacity fivefold to 240 gigalitres at an estimated cost of A$850 million. The plan was criticised by the Opposition as not providing any new water, and by ecologist David Paton as threatening surrounding wildlife. On 26 September 2010, Mount Bold Reservoir was opened for the first time since 2005 after receiving large amounts of rainfall in the week leading up to the date. The resulting water flushed out the Onkaparinga Catchment, causing several flooded roads but removing debris which had been building up for many years. Type of wall: Concrete gravity arch
How to get to Mount Bold with public transport- About the place
Easier to get to Mount Bold in…