Skip to main content

How to get to Submissive Engineering & Construction in Singapore by Bus or Metro?

See Submissive Engineering & Construction, Singapore, on the map

Directions to Submissive Engineering & Construction (Singapore) with public transport

The following transport lines have routes that pass near Submissive Engineering & Construction

  • BusBus:
  • MetroMetro:

How to get to Submissive Engineering & Construction by Bus?

Click on the Bus route to see step by step directions with maps, line arrival times and updated time schedules.

How to get to Submissive Engineering & Construction by Metro?

Click on the Metro route to see step by step directions with maps, line arrival times and updated time schedules.

Bus stations near Submissive Engineering & Construction in Singapore

  • Upp S'Goon Rd - Opp Glad Tidings CH (63041),4 min walk,
  • Upp S'Goon Rd - Glad Tidings CH (63049),4 min walk,
  • Upp S'Goon Rd - Kovan Stn Exit B (63031),8 min walk,
  • Hougang Ave 2 - Opp Blk 615 (63339),9 min walk,
  • Hougang Ave 2 - Blk 708 (63349),10 min walk,
  • Upp S'Goon Rd - Opp Blk 25 (63061),10 min walk,
  • Tampines Rd - the Tembusu (63131),11 min walk,
  • Hougang Ave 2 - Blk 615 (63331),12 min walk,
  • Hougang Ave 2 - Opp Blk 709 (63341),12 min walk,

Metro stations near Submissive Engineering & Construction in Singapore

  • Kovan (NE13),9 min walk,
  • Serangoon (NE12|CC13),32 min walk,

Bus lines to Submissive Engineering & Construction in Singapore

  • 80,Sengkang Int ↔ HarbourFront Int,
  • 81,Tampines Int ↺ Serangoon Ctrl,
  • 82,Punggol Temp Int ↺ Serangoon Ctrl,
  • 101,Serangoon Int ↺ Buangkok Cres,
  • 107,Hougang Ctrl Int ↔ Shenton Way Ter,
  • 112,Hougang Ctrl Int ↺ Hougang St 92,
  • 113,Hougang Ctrl Int ↺ Upp Paya Lebar Rd,
  • 119,Punggol Temp Int ↺ Hougang St 21,
  • 136,Ang Mo Kio Int ↔ Punggol Temp Int,
  • 153,Bt Merah Int ↔ Hougang Ctrl Int,
  • 107M,Hougang Ctrl Int ↺ Raffles Blvd,
  • 115,Hougang St 21 (Kovan Hub),
  • 80A,Aljunied Rd (Aljunied MRT Stn),
  • 112A,Upp Serangoon Rd (Kovan Stn),
  • 113A,Upp Serangoon Rd (Kovan Stn Exit B),
  • 25,Ang Mo Kio Int,
  • 55,Bishan Int,
  • 132,Bt Merah Int,
  • 854,Bedok Int,
  • 62,Punggol Temp Int,
Questions & Answers
  • What are the nearest stations to Submissive Engineering & Construction?

    The nearest stations to Submissive Engineering & Construction are:

    • Upp S'Goon Rd - Opp Glad Tidings CH (63041) is 218 meters away, 4 min walk.
    • Upp S'Goon Rd - Glad Tidings CH (63049) is 274 meters away, 4 min walk.
    • Upp S'Goon Rd - Kovan Stn Exit B (63031) is 568 meters away, 8 min walk.
    • Hougang Ave 2 - Opp Blk 615 (63339) is 608 meters away, 9 min walk.
    • Kovan (NE13) is 645 meters away, 9 min walk.
    • Hougang Ave 2 - Blk 708 (63349) is 693 meters away, 10 min walk.
    • Upp S'Goon Rd - Opp Blk 25 (63061) is 703 meters away, 10 min walk.
    • Tampines Rd - the Tembusu (63131) is 801 meters away, 11 min walk.
    • Hougang Ave 2 - Blk 615 (63331) is 839 meters away, 12 min walk.
    • Hougang Ave 2 - Opp Blk 709 (63341) is 910 meters away, 12 min walk.
    • Serangoon (NE12|CC13) is 2399 meters away, 32 min walk.
  • Which Bus lines stop near Submissive Engineering & Construction?

    These Bus lines stop near Submissive Engineering & Construction: 101, 107, 136, 153, 81

  • Which Metro lines stop near Submissive Engineering & Construction?

    These Metro lines stop near Submissive Engineering & Construction: NORTH EAST LINE

  • What’s the nearest metro station to Submissive Engineering & Construction in Singapore?

    The nearest metro station to Submissive Engineering & Construction in Singapore is Kovan (NE13). It’s a 9 min walk away.

  • What’s the nearest bus stop to Submissive Engineering & Construction in Singapore?

    The nearest bus stops to Submissive Engineering & Construction in Singapore are Upp S'Goon Rd - Opp Glad Tidings CH (63041) and Upp S'Goon Rd - Glad Tidings CH (63049). The closest one is a 4 min walk away.

  • What time is the first Bus to Submissive Engineering & Construction in Singapore?

    The 101 is the first Bus that goes to Submissive Engineering & Construction in Singapore. It stops nearby at 05:15.

  • What time is the last Bus to Submissive Engineering & Construction in Singapore?

    The 51 is the last Bus that goes to Submissive Engineering & Construction in Singapore. It stops nearby at 01:41.

  • What time is the first Metro to Submissive Engineering & Construction in Singapore?

    The NORTH EAST LINE is the first Metro that goes to Submissive Engineering & Construction in Singapore. It stops nearby at 05:46.

  • What time is the last Metro to Submissive Engineering & Construction in Singapore?

    The CIRCLE LINE is the last Metro that goes to Submissive Engineering & Construction in Singapore. It stops nearby at 00:26.

See Submissive Engineering & Construction, Singapore, on the map

The Most Popular Urban Mobility App in Singapore.
All local mobility options in one app

Public Transit to Submissive Engineering & Construction in Singapore

Wondering how to get to Submissive Engineering & Construction in Singapore, Singapore? Moovit helps you find the best way to get to Submissive Engineering & Construction with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Submissive Engineering & Construction in real time.

Looking for the nearest stop or station to Submissive Engineering & Construction? Check out this list of stops closest to your destination: Upp S'Goon Rd - Opp Glad Tidings CH (63041); Upp S'Goon Rd - Glad Tidings CH (63049); Upp S'Goon Rd - Kovan Stn Exit B (63031); Hougang Ave 2 - Opp Blk 615 (63339); Kovan (NE13); Hougang Ave 2 - Blk 708 (63349); Upp S'Goon Rd - Opp Blk 25 (63061); Tampines Rd - the Tembusu (63131); Hougang Ave 2 - Blk 615 (63331); Hougang Ave 2 - Opp Blk 709 (63341); Serangoon (NE12|CC13).

Bus:Metro:

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Submissive Engineering & Construction easily from the Moovit App or Website.

We make riding to Submissive Engineering & Construction easy, which is why over 1.5 million users, including users in Singapore, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of Bus and Metro, costs and ride fares to Submissive Engineering & Construction, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Submissive Engineering & Construction Address: 6 Lim Ah Pin Rd street in Singapore

Submissive Engineering & Construction, Singapore

Public transport routes with stations closest to Submissive Engineering & Construction in Singapore

Metro lines with stations closest to Submissive Engineering & Construction in Singapore

Bus lines with stations closest to Submissive Engineering & Construction in Singapore

Easier to get to Submissive Engineering & Construction in…