Skip to main content

How to get from Palmer Blvd @ Gantt Ave to Nokomis, FL by bus?

From Palmer Blvd @ Gantt Ave to Nokomis, FL by bus

To get from Palmer Blvd @ Gantt Ave to Nokomis, FL you’ll need to take 3 bus lines: take the 03 bus from Palmer Blvd @ Gantt Ave station to Bahia Vista St @ Beneva Rd station. Next, you’ll have to switch to the 06 bus and finally take the 17 bus from Sarasota Square Blvd @ Sarasota Square Blvd station to S Tamiami Trl @ Pocono Trl W station. The total trip duration for this route is approximately 1 hr 24 min. The bus schedule from Palmer Blvd @ Gantt Ave may change. We recommend you check the updated bus schedule to Nokomis, FL on the Moovit app.

84min
Walk to bus station
Bus - 0303
Bus - 0606
Bus - 1717
Walk to Nokomis, FL
Leaves from Palmer Blvd @ Gantt Ave

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Palmer Blvd @ Gantt Ave
    ID PALGANEB
    20 yd • 1 min
  • 2
    Bus - 0303
    Wait for bus
    03
    N Lemon Ave @ 2nd St
  • 3
    Ride to bus station
    Ride to bus station
    Bahia Vista St @ Beneva Rd
    ID BAHBENW1
    13 min
  • 4
    Walk to bus station
    Walk to bus station
    Beneva Rd @ Birky St
    ID BENBIRSB
    150 yd • 2 min
  • 5
    Bus - 0606
    Wait for bus
    06
    Sarasota Square Blvd @ Sarasota Square Blvd
  • 6
    Ride to bus station
    Ride to bus station
    Sarasota Square Blvd @ Sarasota Square Blvd
    ID SSMSEARS
    17 min
  • 7
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 8
    Ride to bus station
    Ride to bus station
    S Tamiami Trl @ Pocono Trl W
    ID S41POCSB
    21 min
  • 9
    Walk to Nokomis, FL
    Walk to
    Nokomis, FL
    440 yd • 6 min
*Duration based on 8am traffic

Alternative route from Palmer Blvd @ Gantt Ave to Nokomis, FL by bus via 03 and 17

To get from Palmer Blvd @ Gantt Ave to Nokomis, FL in Nokomis, take the 03 bus from Palmer Blvd @ Gantt Ave station to Orange Ave @ State St station. Next, take the 17 bus from Orange Ave @ State St station to S Tamiami Trl @ Palm Ave station. The total trip duration for this route is approximately 1 hr 54 min. The bus schedule from Palmer Blvd @ Gantt Ave may change. We recommend you check the updated bus schedule to Nokomis, FL on the Moovit app.

114min
Walk to bus station
Bus - 0303
Bus - 1717
Walk to Nokomis, FL
Leaves from Palmer Blvd @ Gantt Ave

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Palmer Blvd @ Gantt Ave
    ID PALGANEB
    20 yd • 1 min
  • 2
    Bus - 0303
    Wait for bus
    03
    N Lemon Ave @ 2nd St
  • 3
    Ride to bus station
    Ride to bus station
    Orange Ave @ State St
    ID ORASTANB
    27 min
  • 4
    Walk to bus station
    Walk to bus station
    Orange Ave @ State St
    ID ORASTASB
    30 yd • 1 min
  • 5
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 6
    Ride to bus station
    Ride to bus station
    S Tamiami Trl @ Palm Ave
    ID S41PAMSB
    68 min
  • 7
    Walk to Nokomis, FL
    Walk to
    Nokomis, FL
    510 yd • 6 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Sarasota.
All local mobility options in one app

Public transit directions from Palmer Blvd @ Gantt Ave to Nokomis, FL

The distance between Palmer Blvd @ Gantt Ave and Nokomis, FL is approximately 20.43 mi, which can typically be travelled in 84 min. Moovit will show you the directions from Palmer Blvd @ Gantt Ave to Nokomis, FL by bus, so no matter how you choose to travel in Nokomis – you will always have plenty of easy options.

Bus schedule from Palmer Blvd @ Gantt Ave to Nokomis, FL

To check the bus schedule from Palmer Blvd @ Gantt Ave to Nokomis, FL using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Palmer Blvd @ Gantt Ave) and destination (Nokomis, FL), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Alternative route from Palmer Blvd @ Gantt Ave to Nokomis, FL by bus via 03 and 17

To get from Palmer Blvd @ Gantt Ave to Nokomis, FL in Nokomis, take the 03 bus from Palmer Blvd @ Gantt Ave station to Orange Ave @ State St station. Next, take the 17 bus from Orange Ave @ State St station to S Tamiami Trl @ Palm Ave station. The total trip duration for this route is approximately 1 hr 54 min. The bus schedule from Palmer Blvd @ Gantt Ave may change. We recommend you check the updated bus schedule to Nokomis, FL on the Moovit app.

114min
Walk to bus station
Bus - 0303
Bus - 1717
Walk to Nokomis, FL
Leaves from Palmer Blvd @ Gantt Ave

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Palmer Blvd @ Gantt Ave
    ID PALGANEB
    20 yd • 1 min
  • 2
    Bus - 0303
    Wait for bus
    03
    N Lemon Ave @ 2nd St
  • 3
    Ride to bus station
    Ride to bus station
    Orange Ave @ State St
    ID ORASTANB
    27 min
  • 4
    Walk to bus station
    Walk to bus station
    Orange Ave @ State St
    ID ORASTASB
    30 yd • 1 min
  • 5
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 6
    Ride to bus station
    Ride to bus station
    S Tamiami Trl @ Palm Ave
    ID S41PAMSB
    68 min
  • 7
    Walk to Nokomis, FL
    Walk to
    Nokomis, FL
    510 yd • 6 min
*Duration based on 8am traffic

Questions & Answers

  • What is the fastest way to get from Palmer Blvd @ Gantt Ave to Nokomis, FL?

    The fastest way takes 84 minutes, using Bus line 03, Bus line 06, Bus line 17.

  • What is the alternative route to get from Palmer Blvd @ Gantt Ave to Nokomis, FL?

    The alternative route takes 114 minutes, using Bus line 03, Bus line 17.

  • Is there a direct bus between Palmer Blvd @ Gantt Ave and Nokomis, FL?

    No, you’ll have to take 3 bus lines in total. The total travelling time is 1 hr 24 min.

  • Which bus line goes from Palmer Blvd @ Gantt Ave to Nokomis, FL?

    The 03 bus line goes from Palmer Blvd @ Gantt Ave station near Palmer Blvd @ Gantt Ave in Fruitville to N Lemon Ave @ 2nd St station. From there you’ll have to take one bus line till N Lemon Ave @ 2nd St station near Nokomis, FL.

  • How long does it take to travel from Palmer Blvd @ Gantt Ave to Nokomis, FL by bus?

    The total travel time between Palmer Blvd @ Gantt Ave and Nokomis, FL by bus is about 1 hr 24 min.

  • Where do I get on the bus near Palmer Blvd @ Gantt Ave to get to Nokomis, FL?

    Get on the 03 bus from the Palmer Blvd @ Gantt Ave stop near Palmer Blvd @ Gantt Ave in Fruitville.

  • Where do I get off the bus when travelling between Palmer Blvd @ Gantt Ave and Nokomis, FL?

    Get off the bus at the N Lemon Ave @ 2nd St stop, which is closest to Nokomis, FL.