Skip to main content

How to get from Palmer Blvd @ Gantt Ave to North Port, FL by bus?

Palmer Blvd @ Gantt Ave to North Port, FL - Bus Schedule

The 03 bus from Palmer Blvd @ Gantt Ave to North Port, FL runs from 7:06 AM to 6:06 PM, with departures every 1 hr. The trip takes about 3 hr 22 min, with regular service throughout the operating hours.

From Palmer Blvd @ Gantt Ave to North Port, FL by bus

To get from Palmer Blvd @ Gantt Ave to North Port, FL you’ll need to take 3 bus lines: take the 03 bus from Palmer Blvd @ Gantt Ave station to Orange Ave @ State St station. Next, you’ll have to switch to the 17 bus and finally take the 09 bus from N Seaboard Ave @ E Venice Ave station to S Sumter Blvd @ Cazes Ave station. The total trip duration for this route is approximately 3 hr 22 min. The bus schedule from Palmer Blvd @ Gantt Ave may change. We recommend you check the updated bus schedule to North Port, FL on the Moovit app.

202min
Walk to bus station
Bus - 0303
Bus - 1717
Bus - 0909
Walk to North Port, FL
Leaves from Palmer Blvd @ Gantt Ave

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Palmer Blvd @ Gantt Ave
    ID PALGANEB
    20 yd • 1 min
  • 2
    Bus - 0303
    Wait for bus
    03
    N Lemon Ave @ 2nd St
  • 3
    Ride to bus station
    Ride to bus station
    Orange Ave @ State St
    ID ORASTANB
    27 min
  • 4
    Walk to bus station
    Walk to bus station
    Orange Ave @ State St
    ID ORASTASB
    30 yd • 1 min
  • 5
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 6
    Ride to bus station
    Ride to bus station
    N Seaboard Ave @ E Venice Ave
    ID VENTRDPT
    74 min
  • 7
    Bus - 0909
    Wait for bus
    09
    City Hall Blvd @ Kramer Way
  • 8
    Ride to bus station
    Ride to bus station
    S Sumter Blvd @ Cazes Ave
    ID SUMCAZNB
    43 min
  • 9
    Walk to North Port, FL
    Walk to
    North Port, FL
    500 yd • 6 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Sarasota.
All local mobility options in one app

Public transit directions from Palmer Blvd @ Gantt Ave to North Port, FL

The distance between Palmer Blvd @ Gantt Ave and North Port, FL is approximately 49.32 mi, which can typically be travelled in 202 min. Moovit will show you the directions from Palmer Blvd @ Gantt Ave to North Port, FL by bus, so no matter how you choose to travel in North Port – you will always have plenty of easy options.

Bus schedule from Palmer Blvd @ Gantt Ave to North Port, FL

To check the bus schedule from Palmer Blvd @ Gantt Ave to North Port, FL using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Palmer Blvd @ Gantt Ave) and destination (North Port, FL), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Palmer Blvd @ Gantt Ave to North Port, FL?

    The fastest way takes 202 minutes, using Bus line 03, Bus line 17, Bus line 09.

  • Is there a direct bus between Palmer Blvd @ Gantt Ave and North Port, FL?

    No, you’ll have to take 3 bus lines in total. The total travelling time is 3 hr 22 min.

  • Which bus line goes from Palmer Blvd @ Gantt Ave to North Port, FL?

    The 03 bus line goes from Palmer Blvd @ Gantt Ave station near Palmer Blvd @ Gantt Ave in Fruitville to Orange Ave @ State St station. From there you’ll have to take one bus line till Orange Ave @ State St station near North Port, FL.

  • How long does it take to travel from Palmer Blvd @ Gantt Ave to North Port, FL by bus?

    The total travel time between Palmer Blvd @ Gantt Ave and North Port, FL by bus is about 3 hr 22 min.

  • Where do I get on the bus near Palmer Blvd @ Gantt Ave to get to North Port, FL?

    Get on the 03 bus from the Palmer Blvd @ Gantt Ave stop near Palmer Blvd @ Gantt Ave in Fruitville.

  • Where do I get off the bus when travelling between Palmer Blvd @ Gantt Ave and North Port, FL?

    Get off the bus at the Orange Ave @ State St stop, which is closest to North Port, FL.