Skip to main content

How to get from Gantt Rd @ Country Walk Ln to Scf Venice by bus?

Gantt Rd @ Country Walk Ln to Scf Venice - Bus Schedule

The 19 bus from Gantt Rd @ Country Walk Ln to Scf Venice runs from 5:53 AM to 8:53 PM, with departures every 1 hr. The trip takes about 2 hr 14 min, with regular service throughout the operating hours.

From Gantt Rd @ Country Walk Ln to Scf Venice by bus

To get from Gantt Rd @ Country Walk Ln to Scf Venice in Sarasota, you’ll need to take 3 bus lines: take the 19 bus from Gantt Rd @ Country Walk Ln station to Mall Dr @ Gateway Ave station. Next, you’ll have to switch to the 17 bus and finally take the 09 bus from N Seaboard Ave @ E Venice Ave station to S Tamiami Trl @ S West Villages Pkwy station. The total trip duration for this route is approximately 2 hr 14 min. The bus schedule from Gantt Rd @ Country Walk Ln may change. We recommend you check the updated bus schedule to Scf Venice on the Moovit app.

134min
Bus - 1919
Bus - 1717
Bus - 0909
Walk to Scf Venice
Leaves from Gantt Rd @ Country Walk Ln

Step by Step

  • 1
    Start from bus station
    Start from bus station
    Gantt Rd @ Country Walk Ln
  • 2
    Bus - 1919
    Wait for bus
    19
    Mall Dr @ Gateway Ave
  • 3
    Ride to bus station
    Ride to bus station
    Mall Dr @ Gateway Ave
    ID SARPAV
    13 min
  • 4
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 5
    Ride to bus station
    Ride to bus station
    N Seaboard Ave @ E Venice Ave
    ID VENTRDPT
    40 min
  • 6
    Bus - 0909
    Wait for bus
    09
    City Hall Blvd @ Kramer Way
  • 7
    Ride to bus station
    Ride to bus station
    S Tamiami Trl @ S West Villages Pkwy
    ID SCFVEN
    23 min
  • 8
    Walk to Scf Venice
    Walk to
    Scf Venice
    310 yd • 4 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Sarasota.
All local mobility options in one app

Public transit directions from Gantt Rd @ Country Walk Ln to Scf Venice

The distance between Gantt Rd @ Country Walk Ln, Sarasota and Scf Venice, Sarasota is approximately 30.8 mi, which can typically be traveled in 134 min. Moovit will show you the directions from Gantt Rd @ Country Walk Ln to Scf Venice by bus, so no matter how you choose to travel in Sarasota – you will always have plenty of easy options.

Bus schedule from Gantt Rd @ Country Walk Ln to Scf Venice

To check the bus schedule from Gantt Rd @ Country Walk Ln to Scf Venice using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Gantt Rd @ Country Walk Ln) and destination (Scf Venice), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Gantt Rd @ Country Walk Ln to Scf Venice?

    The fastest way takes 134 minutes, using bus line 19, bus line 17, bus line 09.

  • Is there a direct bus between Gantt Rd @ Country Walk Ln and Scf Venice in Sarasota?

    No, you’ll have to take 3 bus lines in total. The total traveling time is 2 hr 14 min.

  • Which bus line goes from Gantt Rd @ Country Walk Ln to Scf Venice in Sarasota?

    The 19 bus line goes from Mall Dr @ Gateway Ave station near Gantt Rd @ Country Walk Ln to N Seaboard Ave @ E Venice Ave station. From there you’ll have to take one bus line till N Seaboard Ave @ E Venice Ave station near Scf Venice in Sarasota.

  • How long does it take to travel from Gantt Rd @ Country Walk Ln to Scf Venice in Sarasota by bus?

    The total travel time between Gantt Rd @ Country Walk Ln and Scf Venice in Sarasota by bus is about 2 hr 14 min.

  • Where do I get on the bus near Gantt Rd @ Country Walk Ln to get to Scf Venice in Sarasota?

    Get on the 19 bus from the Mall Dr @ Gateway Ave stop near Gantt Rd @ Country Walk Ln in Sarasota.

  • Where do I get off the bus when traveling between Gantt Rd @ Country Walk Ln and Scf Venice in Sarasota?

    Get off the bus at the N Seaboard Ave @ E Venice Ave stop, which is closest to Scf Venice in Sarasota.