How to get from Gantt Rd @ Oakshire Ave to Scf Venice by bus?
Gantt Rd @ Oakshire Ave to Scf Venice - Bus Schedule
The 19 bus from Gantt Rd @ Oakshire Ave to Scf Venice runs from 5:54 AM to 8:54 PM, with departures every 1 hr. The trip takes about 2 hr 13 min, with regular service throughout the operating hours.
From Gantt Rd @ Oakshire Ave to Scf Venice by bus
To get from Gantt Rd @ Oakshire Ave to Scf Venice in Sarasota, you’ll need to take 3 bus lines: take the 19 bus from Gantt Rd @ Oakshire Ave station to Mall Dr @ Gateway Ave station. Next, you’ll have to switch to the 17 bus and finally take the 09 bus from N Seaboard Ave @ E Venice Ave station to S Tamiami Trl @ S West Villages Pkwy station. The total trip duration for this route is approximately 2 hr 13 min. The bus schedule from Gantt Rd @ Oakshire Ave may change. We recommend you check the updated bus schedule to Scf Venice on the Moovit app.
Step by Step
- 1Start from bus stationGantt Rd @ Oakshire Ave
- 2Wait for bus19Mall Dr @ Gateway Ave
- 3Ride to bus stationMall Dr @ Gateway AveID SARPAV12 min
- 4Wait for bus17N Seaboard Ave @ E Venice Ave
- 5Ride to bus stationN Seaboard Ave @ E Venice AveID VENTRDPT40 min
- 6Wait for bus09City Hall Blvd @ Kramer Way
- 7Ride to bus stationS Tamiami Trl @ S West Villages PkwyID SCFVEN23 min
- 8Walk toScf Venice310 yd • 4 min
Public transit directions from Gantt Rd @ Oakshire Ave to Scf Venice
Bus schedule from Gantt Rd @ Oakshire Ave to Scf Venice
Related Routes
- Sarasota Cattlemen Transfer Center to Scf Venice
- Ringling Blvd @ S Tuttle Ave to Scf Venice
- Ringling Blvd @ Pine Pl to Scf Venice
- Ringling Blvd @ S Osprey Ave to Scf Venice
- Fruitville Rd @ Cattlemen Rd to Scf Venice
- Cattlemen Rd @ Sawgrass Rd to Scf Venice
- Ringling Blvd @ East Ave to Scf Venice
- Bahia Vista St @ Coleman Ave to Scf Venice
- Bahia Vista St @ Gantt Ave to Scf Venice
- Bahia Vista St @ Albritton Ave to Scf Venice
- Bahia Vista St @ Cornish Ct to Scf Venice
- Bahia Vista St @ Honore Ave to Scf Venice
- Bahia Vista St @ Witmarsum Blvd to Scf Venice
- Bahia Vista St @ Keely Ln to Scf Venice
- Bahia Vista St @ Stone Ridge Trl to Scf Venice
- Bahia Vista St @ Sherwood Forest Dr to Scf Venice
- Fruitville Rd @ Whispering Oaks Ct to Scf Venice
- Fruitville Rd @ Bobby Jones Rd to Scf Venice
- Fruitville Rd @ Amherst Ave to Scf Venice
- Fruitville Rd @ Beneva Rd to Scf Venice
Questions & Answers
What is the fastest way to get from Gantt Rd @ Oakshire Ave to Scf Venice?
The fastest way takes 133 minutes, using Bus line 19, Bus line 17, Bus line 09.
Is there a direct bus between Gantt Rd @ Oakshire Ave and Scf Venice in Sarasota?
No, you’ll have to take 3 bus lines in total. The total travelling time is 2 hr 13 min.
Which bus line goes from Gantt Rd @ Oakshire Ave to Scf Venice in Sarasota?
The 19 bus line goes from Mall Dr @ Gateway Ave station near Gantt Rd @ Oakshire Ave to N Seaboard Ave @ E Venice Ave station. From there you’ll have to take one bus line till N Seaboard Ave @ E Venice Ave station near Scf Venice in Sarasota.
How long does it take to travel from Gantt Rd @ Oakshire Ave to Scf Venice in Sarasota by bus?
The total travel time between Gantt Rd @ Oakshire Ave and Scf Venice in Sarasota by bus is about 2 hr 13 min.
Where do I get on the bus near Gantt Rd @ Oakshire Ave to get to Scf Venice in Sarasota?
Get on the 19 bus from the Mall Dr @ Gateway Ave stop near Gantt Rd @ Oakshire Ave in Sarasota.
Where do I get off the bus when travelling between Gantt Rd @ Oakshire Ave and Scf Venice in Sarasota?
Get off the bus at the N Seaboard Ave @ E Venice Ave stop, which is closest to Scf Venice in Sarasota.
Popular Routes
- 27th St E/31st Ave E to Nokomis, FL
- Us 301/Palm 2nd St to Bradenton, FL
- Us 301/Ridgewood Blvd to Nokomis, FL
- 30th Ave E/11th St Ct E to Bradenton, FL
- 10th St W/14th Ave W to Bradenton, FL
- 301 Blvd E/44th Ave E to Bradenton, FL
- Venice to North Port
- 9th St W/26th Ave W to Bradenton, FL
- 30th Ave W/9th St W to Nokomis, FL
- Sr 64 E/43rd St Blvd E to Bradenton, FL
- 26th St W/49th Ave W to Nokomis, FL
- 301 Blvd W @ 9th St Ext to Bradenton, FL
- Beneva Rd @ Clark Rd to Bradenton, FL
- Us 41/Tallevast Rd to Nokomis, FL
- 26th St W/10th Ave W to Nokomis, FL
- 30th Ave W/1st St (Us 41) to North Port, FL
- Manatee Ave W/Flamingo Dr to Nokomis, FL
- 53rd Ave W @ 17th St W to Bradenton, FL
- Sr 64 E/Cypress Creek Blvd to Bradenton, FL
- 2nd Ave W/14th St W to Nokomis, FL