Skip to main content

How to get from Palmer Blvd @ Gantt Ave to Scf Venice by bus?

Palmer Blvd @ Gantt Ave to Scf Venice - Bus Schedule

The 03 bus from Palmer Blvd @ Gantt Ave to Scf Venice runs from 7:06 AM to 6:06 PM, with departures every 1 hr. The trip takes about 3 hr, with regular service throughout the operating hours.

From Palmer Blvd @ Gantt Ave to Scf Venice by bus

To get from Palmer Blvd @ Gantt Ave to Scf Venice in Sarasota, you’ll need to take 3 bus lines: take the 03 bus from Palmer Blvd @ Gantt Ave station to Orange Ave @ State St station. Next, you’ll have to switch to the 17 bus and finally take the 09 bus from N Seaboard Ave @ E Venice Ave station to S Tamiami Trl @ S West Villages Pkwy station. The total trip duration for this route is approximately 180 min. The bus schedule from Palmer Blvd @ Gantt Ave may change. We recommend you check the updated bus schedule to Scf Venice on the Moovit app.

180min
Walk to bus station
Bus - 0303
Bus - 1717
Bus - 0909
Walk to Scf Venice
Leaves from Palmer Blvd @ Gantt Ave

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Palmer Blvd @ Gantt Ave
    ID PALGANEB
    20 yd • 1 min
  • 2
    Bus - 0303
    Wait for bus
    03
    N Lemon Ave @ 2nd St
  • 3
    Ride to bus station
    Ride to bus station
    Orange Ave @ State St
    ID ORASTANB
    27 min
  • 4
    Walk to bus station
    Walk to bus station
    Orange Ave @ State St
    ID ORASTASB
    30 yd • 1 min
  • 5
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 6
    Ride to bus station
    Ride to bus station
    N Seaboard Ave @ E Venice Ave
    ID VENTRDPT
    74 min
  • 7
    Bus - 0909
    Wait for bus
    09
    City Hall Blvd @ Kramer Way
  • 8
    Ride to bus station
    Ride to bus station
    S Tamiami Trl @ S West Villages Pkwy
    ID SCFVEN
    23 min
  • 9
    Walk to Scf Venice
    Walk to
    Scf Venice
    310 yd • 4 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Sarasota.
All local mobility options in one app

Public transit directions from Palmer Blvd @ Gantt Ave to Scf Venice

The distance between Palmer Blvd @ Gantt Ave, Sarasota and Scf Venice, Sarasota is approximately 40.43 mi, which can typically be travelled in 180 min. Moovit will show you the directions from Palmer Blvd @ Gantt Ave to Scf Venice by bus, so no matter how you choose to travel in Sarasota – you will always have plenty of easy options.

Bus schedule from Palmer Blvd @ Gantt Ave to Scf Venice

To check the bus schedule from Palmer Blvd @ Gantt Ave to Scf Venice using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Palmer Blvd @ Gantt Ave) and destination (Scf Venice), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Palmer Blvd @ Gantt Ave to Scf Venice?

    The fastest way takes 180 minutes, using Bus line 03, Bus line 17, Bus line 09.

  • Is there a direct bus between Palmer Blvd @ Gantt Ave and Scf Venice?

    No, you’ll have to take 3 bus lines in total. The total travelling time is 180 min.

  • Which bus line goes from Palmer Blvd @ Gantt Ave to Scf Venice?

    The 03 bus line goes from Palmer Blvd @ Gantt Ave station near Palmer Blvd @ Gantt Ave in Fruitville to Orange Ave @ State St station. From there you’ll have to take one bus line till Orange Ave @ State St station near Scf Venice in Sarasota.

  • How long does it take to travel from Palmer Blvd @ Gantt Ave to Scf Venice by bus?

    The total travel time between Palmer Blvd @ Gantt Ave in Fruitville and Scf Venice in Sarasota by bus is about 180 min.

  • Where do I get on the bus near Palmer Blvd @ Gantt Ave to get to Scf Venice?

    Get on the 03 bus from the Palmer Blvd @ Gantt Ave stop near Palmer Blvd @ Gantt Ave in Fruitville.

  • Where do I get off the bus when travelling between Palmer Blvd @ Gantt Ave and Scf Venice?

    Get off the bus at the Orange Ave @ State St stop, which is closest to Scf Venice in Sarasota.