Skip to main content

How to get to Cornerstone Engineering in Milwaukie by Bus or Light Rail?

See Cornerstone Engineering, Milwaukie, on the map

Directions to Cornerstone Engineering (Milwaukie) with public transportation

The following transit lines have routes that pass near Cornerstone Engineering

  • BusBus:

How to get to Cornerstone Engineering by Bus?

Click on the Bus route to see step by step directions with maps, line arrival times and updated time schedules.

Bus stations near Cornerstone Engineering in Milwaukie

  • SE International Way & 40th (West),6 min walk,
  • SE 34th & Sellwood (South),10 min walk,

Light Rail stations near Cornerstone Engineering in Milwaukie

  • Clackamas Town Center Transit Center,47 min walk,
  • Milwaukie/Main,49 min walk,

Bus lines to Cornerstone Engineering in Milwaukie

  • 152,Clackamas Town Center Transit Center (South),
  • 29,Clackamas Town Center Transit Center (South),
Questions & Answers
  • What are the closest stations to Cornerstone Engineering?

    The closest stations to Cornerstone Engineering are:

    • SE International Way & 40th (West) is 393 yards away, 6 min walk.
    • SE 34th & Sellwood (South) is 815 yards away, 10 min walk.
    • Clackamas Town Center Transit Center is 3979 yards away, 47 min walk.
    • Milwaukie/Main is 4089 yards away, 49 min walk.
  • Which Bus lines stop near Cornerstone Engineering?

    These Bus lines stop near Cornerstone Engineering: 152, 29, 75

  • What’s the nearest bus stop to Cornerstone Engineering in Milwaukie?

    The nearest bus stop to Cornerstone Engineering in Milwaukie is SE International Way & 40th (West). It’s a 6 min walk away.

  • What time is the first Light Rail to Cornerstone Engineering in Milwaukie?

    The ORANGE is the first Light Rail that goes to Cornerstone Engineering in Milwaukie. It stops nearby at 4:19 AM.

  • What time is the last Light Rail to Cornerstone Engineering in Milwaukie?

    The ORANGE is the last Light Rail that goes to Cornerstone Engineering in Milwaukie. It stops nearby at 1:02 AM.

  • What time is the first Bus to Cornerstone Engineering in Milwaukie?

    The 29 is the first Bus that goes to Cornerstone Engineering in Milwaukie. It stops nearby at 6:01 AM.

  • What time is the last Bus to Cornerstone Engineering in Milwaukie?

    The 152 is the last Bus that goes to Cornerstone Engineering in Milwaukie. It stops nearby at 6:29 PM.

See Cornerstone Engineering, Milwaukie, on the map

The Most Popular Urban Mobility App in Milwaukie.
All local mobility options in one app

Public Transit to Cornerstone Engineering in Milwaukie

Wondering how to get to Cornerstone Engineering in Milwaukie, United States? Moovit helps you find the best way to get to Cornerstone Engineering with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Cornerstone Engineering in real time.

Looking for the nearest stop or station to Cornerstone Engineering? Check out this list of stops closest to your destination: SE International Way & 40th (West); SE 34th & Sellwood (South); Clackamas Town Center Transit Center; Milwaukie/Main.

Bus:

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Cornerstone Engineering easily from the Moovit App or Website.

We make riding to Cornerstone Engineering easy, which is why over 1.5 million users, including users in Milwaukie, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of Bus and Light Rail, costs and ride fares to Cornerstone Engineering, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Cornerstone Engineering Address: 4040 SE International Way Portland, OR 97222 street in Milwaukie

Cornerstone Engineering, Milwaukie

Public transit lines with stations closest to Cornerstone Engineering in Milwaukie

Bus lines with stations closest to Cornerstone Engineering in Milwaukie

Easier to get to Cornerstone Engineering in…